You are here: Home Front Page Pictures/Articles HGP’s SoDAR Unit NOW Available for IMMEDIATE Purchase or Lease
HGP’s SoDAR Unit NOW Available for IMMEDIATE Purchase or Lease PDF Print E-mail
AddThis Social Bookmark Button


Summer 2011 

One complete and fully portable miniSoDAR system (DC powered), manufactured by Atmospheric Systems Corp (ASC), and includes:

  • Digital Acoustic Signal Processor (dASP)
  • Audio Power Amplifier (APA)
  • Model 4000 Fiberglass enclosure & enclosure cuff
  • Steered beam 32-element array antenna
  • Compact flash data storage module
  • Five (5) solar panels (390 watts), solar panel combiner and solar power controller
  • Ten (10) New Optima glass impregnated (no spill) Blue Top Deep Cycle Batteries
  • Satellite uplink module (hardware and software, satellite uplink contract time available)
  • Operational and real time display software
  • System and interconnecting cables, system hardware & software manuals
  • Open 8’x12’ trailer on which the hardware and miniSoDAR are mounted
  • Misc. spare parts for SoDAR and trailer security (hitch lock, cables, etc.)
  • A complete PM Spring 2010 with new Optima batteries installed in 2009


Recently completed a 5-month assignment for UNR at a remote High Elevation site with data recovery at over 98%. And has undergone a complete PM and is ready for deployment!

New Discounted SoDAR - On Sale for $32,950.00 plus shipping and setup costs and HGP may set up on Owner’s site and train new Owner or Lessee depending upon location and other terms. Contact for Lease terms.

HGP’s monthly wind resource analysis also available as an option under the SoDAR Lease Option for ~$4,600.00 per month including the SoDAR lease or as negotiated. This includes ten (10) minute wind data averaging, raw wind data at multiple Client elevation ranges stored (~20M to over 200m) on our web site with Client access, data processing, and wind resource data analysis with up to three (3) wind turbine machine power generation output estimate using wind turbine power curves, simulations using monthly and cumulative wind data, and a back up CD at the end of the lease. Minimum three (3) month lease is required. Without wind analysis ~$3,000,00 a month.

Inquire to receive a sample Generic HGP Wind Analysis Monthly Wind Resource Evaluation Report (MWRER)